Concrete & Formwork Takeoff Services for contractors
Concrete and formwork quantities for foundations, slabs and structural elements, measured from your structural and architectural drawings. Based in East York, Toronto, and serving the GTA, the rest of Canada and the US. Fixed-price quote within 2 hours of receiving your plans. Takeoffs delivered in 24–48 hours after you give the go-ahead.
What's included in the takeoff
- Footings, pads and strip footings in cubic metres or cubic yards
- Foundation walls, piers, columns, grade beams and retaining walls
- Slabs on grade and suspended slabs, with thickness changes, thickenings and edges
- Formwork contact area by element
- Reinforcing steel quantities where bar sizes and spacing are detailed
- Vapour barrier, under-slab insulation, granular base and finishing areas as specified
What to send us
- Structural drawings (foundation plans, sections, details, schedules)
- Architectural plans for slab and floor extents
- Geotechnical or engineer's notes if they affect scope
- Your preferred units (metric or imperial)
What you get back
Excel workbook
Editable formulas, organized by CSI division, area or however you prefer to work.
PDF plan markups
Color-coded markups showing exactly what was measured, so you can check everything.
Assumptions & exclusions
Clearly listed, so nothing gets assumed on bid day.
Turnaround & pricing
Every job is fixed-price. Send your plans and you'll have a quote within 2 hours of us receiving them. Once you give the go-ahead, your takeoff is delivered in 24–48 hours. How pricing works →
FAQs
Metric or imperial?
Either. Tell us which units your supplier and crew use.
Do you include rebar?
Yes, when the drawings detail bar sizes and spacing. If they don't, we note it as an assumption or exclusion.
Can you split quantities by pour?
Yes. If you share your pour sequence, we'll break the quantities out to match it.
Got plans? Get a fixed-price quote in 2 hours.
Send drawings by form, email or WhatsApp. Takeoffs land 24–48 hours after you say go.